YOOGAO Pet Long Dog Training Leash Dog Lead with Special Non-Slip Design and Padded Handle, 10/15/33/50 ft, for Any Size of Dogs

Amazon.com Price: $25.99 (as of 26/02/2020 09:12 PST- Details)

STURDY AND DURABLE – 50 ft long x 0.7 inch wide. High-quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain
SPECIAL NON-SLIP DESIGN – With woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog pulling.
COMFORTABLE PADDED HANDLE – With neoprene padded hand loop. Lightweight and comfortable in your hands.

Usually ships in 24 hours

Category:
 

Description


Size and Color

S: 10 ft long x 0.7 inch wide. Color: black and green
M: 15 ft long x 0.7 inch wide. Color: black and red
L: 33 ft long x 0.7 inch wide. Color: black and red
XL: 50 ft long x 0.7 inch wide. Color: blue and green

Feature

¡¤High-quality nylon strap with woven-in rubber strips
¡¤Extra robust
¡¤Non-slip with maximum grip
¡¤Neoprene padded hand loop
¡¤For dog training, e.g. when training requires distance
¡¤For tracking work or on the lookout for wounded game (hunting)
¡¤For more freedom of movement

Make a selection a suitable length to shop for! And benefit from the funny time together with your pets!

YOGADOG – Only provide hight quality pet products. Bringing to you and your pet with joy and fun within the life.
STURDY AND DURABLE – 50 ft long x 0.7 inch wide. High-quality nylon strap. Extra robust. Bright color within the middle. Visible in a wide variety of terrain
SPECIAL NON-SLIP DESIGN – With woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog pulling.
COMFORTABLE PADDED HANDLE – With neoprene padded hand loop. Lightweight and comfortable for your hands.
CONVENIENT USE – Twisting resistant and water resistant. Suitable for any weather and any size of dogs.
WIDE APPLICABILITY – Works great for tracking work like searching/hunting or training like recall/distance commands. And more freedom of movement on Long-distance outside activities.

Additional information

Binding

Brand

Color

EAN

EAN List

Item Dimensions

Label

Manufacturer

MPN

Package Quantity

Part Number

Product Group

Publisher

Size

Studio

Reviews

There are no reviews yet.

Be the first to review “YOOGAO Pet Long Dog Training Leash Dog Lead with Special Non-Slip Design and Padded Handle, 10/15/33/50 ft, for Any Size of Dogs”

Your email address will not be published. Required fields are marked *