Sale!
 

Zhixuanke 1in wide by 15ft 30ft 50ft 65ft 100ft 160ft 200feet long Nylon Training Leash – For Large,Medium and Small Dogs – Long Lead – Great for Training, Play, Camping, or Backyard 15 feet black

Amazon.com Price: $16.00 $8.99 (as of 21/01/2020 19:11 PST- Details)

NYLON TRAINING LEAD – This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist twisting. Our long dog leash is great for medium and large dogs. You’ll love using it as a backyard dog leash, for off leash dog training, and more.
DIMENSIONS – This dog leash measures 1 inch wide by 15 feet long. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming!
METAL RING FUNTION:1.It can be DIY handle, according to own palm adjust the size automatically. As the picture 4 shows 2、It is fasten to a post in the yard,the lawn or the park.

Usually ships in 24 hours

Category:
 

Description


Built Strong
Nylon leashes have a long lifespan, cotton leashes get frail and break faster than you would think. Free Range 1 inch is built with heavy duty materials that can withstand daily use over an extended time frame. It may be used with medium and large size dogs.

Sizing
15 Feet 30 Feet 50 Feet 65 Feet 100 Feet 160 Feet.

Money Back Guarantee
Your purchase is backed by “The Boss Promise”, our 10 Year Total Satisfaction Guarantee.

Money Back Guarantee
Your purchase is backed by “The Boss Promise”, our 10 Year Total Satisfaction Guarantee.

NYLON TRAINING LEAD – This durable, long, nylon dog training leash will live much longer than cotton leashes. All stitching is reinforced and the nickel plated clip swivels to withstand twisting. Our long dog leash is great for medium and large dogs. You can love the usage of it as a backyard dog leash, for off leash dog training, and more.
DIMENSIONS – This dog leash measures 1 inch wide by 15 feet long. Great for hiking, camping, training, hunting, backyard, beach, recall training, out of doors play with tennis balls, and swimming!
METAL RING FUNTION:1.It may be DIY deal with, according to own palm adjust the size automatically. As the picture 4 shows 2、It is fasten to a post in the yard,the lawn or the park.
LONG LEASH: This training leash is great for teaching your dog recalls. It has the length needed so they can wander and ensure your command to come! is obeyed.
Means that you can teach your dog recalls and other obedience skills.

Reviews

There are no reviews yet.

Be the first to review “Zhixuanke 1in wide by 15ft 30ft 50ft 65ft 100ft 160ft 200feet long Nylon Training Leash – For Large,Medium and Small Dogs – Long Lead – Great for Training, Play, Camping, or Backyard 15 feet black”

Your email address will not be published. Required fields are marked *